CHP Control Upgrade
Turner ECS Retrofits & Upgrades

End of last year we have performed a CHP control upgrade on a MAN 2842LE Biogas Installation in Germany using Woodward's E6 lean burn trim system together with the EASYGEN 3500XT genset controller. Improvements include increased power for ignition, improved engine starts, increased spark plug life and decreased methane-slip. The case study is now available both in English and in German. Please refer to the case study for all the details and contact us if you have similar needs for your CHP biogas installation.

in TECS
Pipelayer/Construction Vessel Control Retrofit
Replacing Viking 35 by LECM

Dirk Storklaan 76
2132 PX Hoofddorp
The Netherlands
Tel: +31 (0) 23 566 23 00

24/7: +31 (0) 6 57 59 22 50
info.nl@turner-ecs.com

Unit 6 Newstead Industrial Estate
Alderflat Drive Trentham
Stoke on Trent ST4 8HX
United Kingdom
Tel: TBD
info.uk@turner-ecs.com

Polo Tecnologico della Brianza Edif. 9 Lab 3
Via Lavoratori Autobianchi 1
20832 Desio, Italy
Tel: +39 0362 62 12 40
info.it@turner-mcs.com

OhmStraße 2
D63225 Langen
Germany
Tel.: +49 (0) 6103 73 299 0
info.de@turner-ecs.com

Bin Hamoodah Building
7th Floor, Sh. Khalifa Street
P.O. Box 203, Abu Dhabi
United Arabic Emirates
Tel: +971 02 626 7912
info.me@turner-ecs.com

Office No. 702
7th Floor Al Mousa Tower
6682 Al Amir Turki-Al Yarmok Dst.
Al Khobar - Saudi Arabia
General: +966 138343734

Mobile: +966(0)504827421
info.me@turner-ecs.com

P.O Box 153
Ein Khalid Commercial Building
Doha, Qatar
Tel: +974 3338 0351
info.me@turner-ecs.com